The Design Process Protocol sets out a common process that local authorities need to follow through each stage of their engagement with PfS. Following this protocol will mean that PfS will be able to effectively support design activities and make sure that 'deliverables' will offer the most suitable levels of support to the Strategy for Change (SfC), Outline Business Case (OBC) and the procurement and operational stages of a BSF project. Deliverables are the required reports, studies, appraisals and other documentation that local authorities must complete to successfully pass through approval processes at various stages of a BSF project.
The protocol includes design templates (see template links below), derived from examples of current BSF projects in the SfC and OBC stages. We feel that they exemplify the level of information required for each stage. They are of course provided as guidance, and to assist the local authority and their advisors in their own work. They define the minimum typical content expected for site analysis, option appraisal, control options and for phasing of the SfC and OBC stages. The circumstances of each option may mean that additional information will need to be provided to reassure the local authority, and PfS, that the options across the Wave are affordable. This is particularly the case at OBC, where PfS will also need to have sufficient information to be able to agree any abnormals allocation, and to have confidence that this, together with the local authority's design strategy, will deliver the best design quality.
Templates A - Tight Urban Site
Templates B - Urban Site
Templates C - Split Site
In the table below text that is coloured red signifies that example templates can be found in each of the Design Templates listed above.
Project Stages |
Design Related Client Team Activities |
Deliverables to PfS |
Core NPT Activities |
Approval |
Strategy for Change part 2 (SfC2) All Schools in the Wave |
Update AMP Analysis |
Existing Site Plan /
Analysis |
Visit LA Sample Schools |
SfC 2 Approval |
Outline Business Case (OBC) All Schools in the Wave |
Option Appraisal |
Updated Site
Plan/Analysis |
Review Deliverables in OBC |
OBC Approval - OJEU Notice |
Invitation to Participate in
Dialogue (ITPD) Sample Schools |
DQI Fave |
Updated Control
Option, if different to OBC |
Ensure Facilitation Briefing DQI for Sample Schools |
Shortlist of Bidders Selected |
Invitation to Continue Dialogue
(ITCD) Sample Schools |
Design Evaluation |
Bidders Design Proposals |
Attend last stage design review meetings
with bidders |
End of Competitive Dialogue |
Invitation to Submit Final Bids (ITSFB) Sample Schools |
Bidders (x2) Final Proposals |
|
|
Preferred Bidder Selected |
Preferred Bidder Sample Schools |
DQI - Design Evaluation |
Final Design Proposals |
|
Final Business Case (FBC) |
Post Occupation Evaluation (POE) |
DQI POE |
POE DQI Report |
|
|