Design Process Protocol

The Design Process Protocol sets out a common process that local authorities need to follow through each stage of their engagement with PfS. Following this protocol will mean that PfS will be able to effectively support design activities and make sure that 'deliverables' will offer the most suitable levels of support to the Strategy for Change (SfC), Outline Business Case (OBC) and the procurement and operational stages of a BSF project. Deliverables are the required reports, studies, appraisals and other documentation that local authorities must complete to successfully pass through approval processes at various stages of a BSF project.

The protocol includes design templates (see template links below), derived from examples of current BSF projects in the SfC and OBC stages. We feel that they exemplify the level of information required for each stage. They are of course provided as guidance, and to assist the local authority and their advisors in their own work. They define the minimum typical content expected for site analysis, option appraisal, control options and for phasing of the SfC and OBC stages. The circumstances of each option may mean that additional information will need to be provided to reassure the local authority, and PfS, that the options across the Wave are affordable. This is particularly the case at OBC, where PfS will also need to have sufficient information to be able to agree any abnormals allocation, and to have confidence that this, together with the local authority's design strategy, will deliver the best design quality.

Templates A - Tight Urban Site
Templates B - Urban Site
Templates C - Split Site

In the table below text that is coloured red signifies that example templates can be found in each of the Design Templates listed above.

Project Stages 

Design Related Client Team Activities 

Deliverables to PfS 

Core NPT Activities

Approval

Strategy for Change part 2 (SfC2)

All Schools in the Wave

Update AMP Analysis

High Level Estate Strategy to support SfC1

School Visions and Design Brief - Stakeholders

Identify level of New Build, Remodelling / Refurbishment

Desktop Surveys

Consultation with Planners

Check land ownership

FAM

Existing Site Plan / Analysis

Option Appraisals

Estate Strategy Map

Initial Control Option


Sustainability - Estate Strategy

Approach to FM and FF&E

FAM

Visit LA Sample Schools

Review Estate Strategy and assumptions

Review FAM

SfC 2 Approval

Outline Business Case (OBC)

All Schools in the Wave

Option Appraisal

Strategic Briefing Process

Detailed Site Surveys

Programme Profile

Abnormals and FAM

Updated Site Plan/Analysis

Strategic Brief

Remodelled Floor Plans

Proposed Control Option/Site Plan

Massing Study (Optional)

Phasing Strategy


Planning Brief/Outline consents

Schedule of Accommodation for Refurbishment Projects

Sustainability - Estate Strategy

Abnormal Proforma

FAM

Review Deliverables in OBC

Identify Abnormal Funding

Agree FAM

Discuss DQI for schools

Check Technical Advisers Costs

OBC Approval - OJEU Notice

Invitation to Participate in Dialogue (ITPD)

Sample Schools

DQI Fave

Compile Final Brief / Output Specification

School Specific Aspirations

Updated Control Option, if different to OBC

DQI FAVE Report

Detailed Brief Output Specification Volume 2

Ensure Facilitation Briefing DQI for Sample Schools

Shortlist of Bidders Selected

Invitation to Continue Dialogue (ITCD)

Sample Schools

Design Evaluation

Bidders Engagement with Schools

Bidders (x3) Initial Proposals

Evaluation and Clarification of Bids

Bidders Design Proposals

CABE Review Panel

Schedule of Accommodation

Attend last stage design review meetings with bidders

Enforce remedial action if required

End of Competitive Dialogue

Invitation to Submit Final Bids (ITSFB)

Sample Schools

Bidders (x2) Final Proposals

 

 

Preferred Bidder Selected

Preferred Bidder

Sample Schools

DQI - Design Evaluation

Design Clarification

Full Planning Permission

Final Design Proposals

FBC Benchmarking Proforma (PFI & D&B)

 

Final Business Case (FBC)

Establish Local Education Partnership (LEP)

Post Occupation Evaluation (POE)

DQI POE

POE DQI Report

BREEAM Report

Benchmarking Proforma Outturn Costs (D&B